Under the Environmental Code of the Republic of Kazakhstan of 2 January 2021 No. 400-VI, the environmental impact assessment begins even before the design documentation is prepared – with the submission of a notice of proposed activity.
The notice of proposed activity is submitted by the initiator to the authorized body in the field of environmental protection. The notice states general information about the initiator, the location and timing of the activity, its main characteristics, the expected types of environmental impact and the proposed alternatives.
For the types of activity listed in Section 1 of Appendix 1 to the Environmental Code, an impact assessment is mandatory. For the types of activity in Section 2 of Appendix 1 to the Environmental Code, a screening of the impacts of the proposed activity is carried out upon application, and the need for an impact assessment is determined from its results. Following the screening, the authorized body issues a screening conclusion stating whether a mandatory impact assessment is required. The absence of such a need does not exempt from compliance with other environmental requirements.
If an impact assessment is required, the scope is determined: the list of issues to be studied in the report on possible impacts, the necessary studies, and the comments and proposals of state bodies and the public. The result is recorded in a scoping conclusion for the impact assessment.
The value of preparing the notice early for the customer is that environmental restrictions are identified, the position of the authorized state bodies (including the bodies for environmental protection, water resources and sanitary and epidemiological welfare) is taken into account, and the further procedure is determined before significant financial, labor and time resources have been invested in design. If the activity may be restricted by environmental legislation, this becomes clear at the earliest stage.
State environmental review of pre-design documentation in its former form is no longer carried out; it is carried out only in the cases provided for by Article 87 of the Environmental Code.
We prepare the notice of proposed activity, support the screening and prepare materials for determining the scope.